| Duration | 3 weeks to full resolution |
| Team Role | Escalation Lead & 8D Facilitator |
| Premium freight avoided | €47,000(plus retained €2.1M annual contract) |
A Tier-1 automotive supplier received an urgent escalation from their OEM customer: dimensional non-conformance on a safety-critical bracket was causing assembly issues at the customer plant. The customer threatened line stoppage and was considering sourcing alternatives.
The supplier's internal quality team was already stretched thin handling routine operations. They needed external expertise to manage the crisis, contain the problem, and deliver a credible 8D response within the customer's 5-day deadline.
Within 4 hours of engagement, we deployed a containment team to implement immediate protection measures.
Parallel to containment, we led a cross-functional 8D team through structured root cause analysis.
With root cause confirmed, we designed and implemented corrective actions addressing both the immediate cause and system gaps.
Speed of containment buys time for thorough investigation. The customer cares less about perfection in the first 24 hours than about seeing decisive action and honest communication.
| 🔄 undefined | |
| 🔄 undefined | |
| 🔄 undefined | |
| 🔄 undefined | |
| 🔄 undefined | |
| 🔄 undefined |
Get this case study as a PDF for easy sharing with your team or for offline reading.
Enter your work email to receive the download link
Let's discuss how we can help you achieve similar results. Schedule a consultation to explore solutions tailored to your specific situation.